To begin with, the Jai Hind metro station was prepared for being elevated. Nevertheless, the AAI objected which the elevated stretch up to the airport might pose a danger to plane, And so the route was additional reworked and the station was shifted underground, 150 m from the Airport terminal constructing. https://claytonxgraf.dsiblogger.com/65184373/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf