Penmann recently finalised a complex HVAC upgrade at Danone Nutricia's Liverpool facility, supplying a purpose-built ventilation and climate control system engineered to meet strict hygiene and production standards. The scope covered the design, supply, installation and commissioning of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) https://bookmark-search.com/story20538413/penmann-delivers-comprehensive-hvac-refurbishment-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2