Project Highlight At a prominent confectionery site in York, Newsome has installed a efficient 400 kW chiller, marking the noteworthy conclusion of the project. Designed to strengthen ESG targets, the installation improves system dependability while lowering overall energy usage and CO₂ levels. https://bookmarkdistrict.com/story20449398/advanced-400-kw-chiller-installation-secures-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving