1

High-Efficiency 400 kW Chiller Installation Delivers Fifty Thousand Pounds Annual Energy Savings and 200 Metric Tonnes CO₂ Reduction

News Discuss 
Installation Overview At a prominent confectionery site in York, Newsome has installed a cutting-edge 400 kW chiller, marking the timely execution of the project. Designed to advance ESG targets, the installation enhances cooling reliability while cutting overall power consumption and CO₂ discharge. https://bookmarkswing.com/story22407395/advanced-400-kw-chiller-installation-secures-50k-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-cut

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story